We provide stair towers, platforms and walkways for tanks and industrial plants. Our material options are carbon or stainless steel with the finishing treatment of your choice.

We also offer safety audits and modernizations for equipment shielding and structural platforms to ensure they are matching the latest standards and norms. 


Tankki T-38OUR SERVICE SCOPE COVERS STRUCTURAL DESIGN, PRODUCT MANUFACTURING AND INSTALLATION.

Our extensive design expertise enables us to create safe structures that comply with applicable standards, while still optimising material efficiency and overall structural weight.

To ensure compliance with local standards and regulations, our main design work normally takes place in the country of destination.  To guarantee cost-efficiency, mechanical engineering planning is done in the country of manufacture, but always in keeping with our own quality system.

Our key expertise lies in project management and we always tailor our services to customer needs. For example, we can provide only the mechanical engineering drawings and manufacturing of the structures.


3D-model of a stair tower

3D-model of a stair tower

WE COMBINE EUROPEAN DESIGN EXCELLENCE WITH CHINESE PRODUCTION CAPACITY.

Our Chinese factory holds EN 1090-1 and EN 1090-2 production quality certificates. All steel structures we import to Europe bear the CE marking, which proves that cost-efficiency does not mean compromising on quality. To save you time and money at the worksite, we assemble as much of each structure as possible at the factory. In Finland and Sweden, we also provide installation services for walkaway systems. In international deliveries, our terms of delivery are typically FOB or DAP.


DESIGN AND PROJECT MANAGEMENT

We use Tekla Structures 3D modelling in our design activities. Project management is handled by our employees in Finland, while the practical supervision of work in China is performed by our local engineers. In every case, mechanical engineering drawings and welding plans are approved in Finland before the actual work begins, and quality control is based on project- and customer-specific plans. We report on the progress of work stage by stage, typically on a weekly basis. Furthermore, we produce statutory reports, such as the declarations of performance (DoP), on each project.


asennusta

WE ARE PROFESSIONALS IN PROJECT MANAGEMENT AND PURCHASING.

For our customers, this means cost savings and deliveries that meet the agreed schedule. Because our efficiency is based on a network of reliable subcontracting partners, with us you do not pay for excess capacity or the supplier’s quiet months.

In addition to professional project management, we always offer the latest technical solutions. Since our services are scalable to customer needs, we can professionally handle both middle-sized and very large structural deliveries.




OVERSEA-TRANSPORTATIONS ARE SLOW AND EXPENSIVE? 
 NOT TRUE.boat icon

It is true that sea transport from China to some European area  takes around five weeks. However, our large design and production capacity enables us to compensate for the lost time at the production stage.

Furthermore, we have fine-tuned our packaging concept so, that although we assemble some of the structures at the factory, we are still able to pack them tightly for transport. We also load the items onto the container in such a manner that they are easy and quick to unload at the worksite.

Auriga (Shanghai) Enterprise Co.,Ltd
ADDRESS
Unit 1902, Building No.1, Xinyue Square,No.155 Songbao Road, Shanghai
PLEASE CONTACT
iris@aurigaeast.com
+86-13818973620
Copyright © 2014 AURIGA[www.aurigaeast.com]. All Rights Reserved.